profile          
process          
work          
contact          
 
  phase 4 phase 3 phase 2 phase 1      

1. As-built and Schematic Design Phase

Measurements and photographs of the existing structure will be taken and drawn to determine the ”as built” conditions of the project. We will then meet to discuss and develop a Detailed Program. The program will list the proposed additions and changes along with possible alternatives.PPD shall prepare Schematic Design Documents consisting of drawings to include Schematic Plans, and Schematic Elevations and 3D views. If desired we could send out these early drawings to 2 or 3 contractors to get preliminary prices
.